Welcome Back/Halas Addition Project Begins!

06.17.13

We are extremely regretful that we have not updated our blog for almost 3 months!! A lot has happened in that time period: we opened the Damen Student Center (see photos at www.luc.edu/damenstudentcenter), celebrated with 2013 graduates, and officially broke ground on Phase 4 of the ReImagine Campaign, the Halas Addition Project.

Slated to be complete in 2014, the Halas Addition Project will connect the Damen Student Center, Halas Recreation Center, and Gentile Arena together in an enclosed walk way. This walk way will extend all the way to the main parking structure on the south side of campus.

The 3 floor addition will include a student lounge, cafe, additional recreation space overlooking a brand new quad area, and offices for the Vice President of Student Development. We are excited about what this addition will mean for student recreation space and how it will transform the West Quad into an area of activity and student life. Below you will find pictures of this project’s beginning stages. Currently crews are clearing the space and preparing the foundation of the addition. Check back soon for updates on this very important project!!

 

ADD COMMENT

Will not be displayed (required)