Damen Student Center Grand Opening

The SCB Fireplace Lounge featured on the 2nd Floor of the Damen Student Center
03.06.13

As many of you readers already might know, we are formally opening the doors to the Damen Student Center on April 3rd, 2013 at 9AM!! We will be opening the doors to the Damen Dining Hall on Monday, April 1st-2nd to accommodate for student meal plans, due to the fact that Rambler Room is closing its doors on Friday, March 29 to prepare for the move to Damen. Access to the rest of the Damen Student Center will be restricted on those days.

(...)

Raise the Roof!

10.23.12

The Arnold J. Damen, S.J. Student Center is about 6 months away from its Grand Opening and it finally looks like a full building…almost!! All of the steel has been placed and the cement poured. Now most of the structural touches that remain include dry wall and framing. As you can see by some of the new pictures

(...)

Summer Successes!

08.21.12

With summer almost over and students moving in

(...)

Interior and Tunnel Progress

07.17.12

With less than 6 weeks left until the students are back and the campus becomes a busy place, Phase 3 of the ReImagine Campaign is quickly progressing. Several pictures give you a view of the Damen Student Center from the roof of Mertz Hall. Not only do they show you the progress that has been

(...)

Window and Dry Wall Additions

07.01.12

With the beatufiul summer Chicago weather, construction crews have been able to make great progress on the Arnold Damen, S.J. Student Center. As you can see by some of the pictures, window frames have been placed on the north and west ends of the building. Window installation is ongoing in both of these areas. Beginning

(...)